Concept Information
Manage BOM
Use the Bill of Material Master [S1000] screen to add, edit, copy, or delete the parts associated to a BOM A bill of material, or BOM, is a list of parts required to build another part..
Prerequisites
Before adding a BOM, you require:
-
All parts, components, and raw materials for the BOM as a separate part record on S1009.
Note: All parts must be added in the Parts Master screen before they can be used in a bill of material. For more information, see Manage Parts.
Click the image to enlarge
To add a part to a bill of material:
Result
You have added a bill of material for the parent part. Next, add the routing detail for the part on S1014.
Notes
-
To action a previously created item, select the item and click the desired mode: Edit, Copy, or Delete.
-
To add Sales, Engineering, Manufacturing, and Planning parameters, navigate to Part Master.
-
To archive items that are no longer in use:
-
In the Archive field, select D
-
In the Status field, select Inactive
-
-
For information on the difference between green, blue, and red fields, see Navigating screens.